IPSUPS-UCTE互联
Synchronous Interconnection
of IPS/UPS with UCTE -
Study Overview
Sergey Kouzmin
Project Manager IPS/UPS, RAO UES of Russia
Black Sea Energy Conference
Bucharest, Romania, April 3-5, 2006
2United Power System UCTE + UPS/IPS
560 GW
300 GW
The world largest synchronous zone:
13 time zones
36 countries
730 million consumers
860 GW installed capacity
3700 TWh annual consumption
UCTE
UPS/IPS
Other power systems
3Why Interconnection?
Driving Forces
Political and economical integration in Europe
Need to diversify energy supply
Powerful grid infrastructure ready
Efficient power system control
Expected Results
Creation of a technological infrastructure for a common power
trading market place
Mutual assistance in case of emergency and higher reliability of
power supply
Optimal use of generation capacity and primary resources
4Objectives of the Study
Considering technical, operational, organizational and legal
issues the study will answer the following questions:
1. Is a full synchronous interconnection of IPS/UPS with UCTE
feasible?
2. What are the mandatory measures and requirements on both
sides?
3. What are the associated costs?
Initial priority:
maintaining the present performance of the
systems with respect to system security and
reliability
Additionally, market aspects and environmental issues are building
the conditional framework
5Major Challenge:
Connection of two huge synchronous systems with different:
geographical extensions
generation and network structures
norms and standards
rules and operation philosophies
Minimum
mandatory set
of technical
requirements
?
Organizational
structures and
procedures
Legal
agreements
6J O I N T L Y
System Modeling
Conceptual
Report
Acceptance by
the Parties
UCTE Model
Data Provision by
Questionnaire
Support by UCTE
Experts
UCTE TSOs
Commitment for Data
Provision
IPS/UPS
Commitment for
Data Provision
U
C
T
E
I
P
S
\
U
P
S
Model
Verification Model Verifica