IPSUPS-UCTE互联.pdf

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
IPSUPS-UCTE互联

Synchronous Interconnection of IPS/UPS with UCTE - Study Overview Sergey Kouzmin Project Manager IPS/UPS, RAO UES of Russia Black Sea Energy Conference Bucharest, Romania, April 3-5, 2006 2United Power System UCTE + UPS/IPS 560 GW 300 GW The world largest synchronous zone: 13 time zones 36 countries 730 million consumers 860 GW installed capacity 3700 TWh annual consumption UCTE UPS/IPS Other power systems 3Why Interconnection? Driving Forces Political and economical integration in Europe Need to diversify energy supply Powerful grid infrastructure ready Efficient power system control Expected Results Creation of a technological infrastructure for a common power trading market place Mutual assistance in case of emergency and higher reliability of power supply Optimal use of generation capacity and primary resources 4Objectives of the Study Considering technical, operational, organizational and legal issues the study will answer the following questions: 1. Is a full synchronous interconnection of IPS/UPS with UCTE feasible? 2. What are the mandatory measures and requirements on both sides? 3. What are the associated costs? Initial priority: maintaining the present performance of the systems with respect to system security and reliability Additionally, market aspects and environmental issues are building the conditional framework 5Major Challenge: Connection of two huge synchronous systems with different: geographical extensions generation and network structures norms and standards rules and operation philosophies Minimum mandatory set of technical requirements ? Organizational structures and procedures Legal agreements 6J O I N T L Y System Modeling Conceptual Report Acceptance by the Parties UCTE Model Data Provision by Questionnaire Support by UCTE Experts UCTE TSOs Commitment for Data Provision IPS/UPS Commitment for Data Provision U C T E I P S \ U P S Model Verification Model Verifica

文档评论(0)

l215322 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档