沈阳建筑二级公路大学论文.doc

  1. 1、本文档共125页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
沈阳建筑二级公路大学论文

摘 要 根据已有的设计资料和中国交通部设计要求以及部颁标准和规范,K0+000~K4+820.041段进行了路基路面综合设计。 km/h,双向车道。 考虑到是区新建公路,在路上选了个交点,半径300m,m,m,m,900m,缓和曲线长度为130m,90m,100m,150m,均符合规范要求。纵断面设计全线共设个变坡点,半径分别为000m,00m,000m,7000m,20000m。小桥涵设计主要进行了上部结构的计算和验算。 本设计部分图纸采用CAD系统绘制,部分数据采用Excel表格计算显示。此次设计使我在专业知识方面得到了综合训练和提高,增强了独立分析和解决问题的能力,取得了良好的效果。 关键词: 二级公路;路基;路面;排水设计;桥梁设计;综合设计 Abstract According to the technical standards and specifications for highway design published by the Ministry of Communications of China,the comprehensive design of highway subgrade and pavement from K0+000 to K4+820.041 has been carried out based on the data of Dalian-Zhuanghe secondary roads in Liaoning Province. The designed vehicle speed is 60km/h, bidirectional two traffic lanes. The main contents of the design included highway line of graphic design,vertical alignment design,line cross-sectional design,subgrade and pavement drainage,pavement structure design,the design of small bridges,construction design,and the preparation of budget estimate,ect. In the plane design,considered is the mountainous terrain area newly built road,I have chosen five points of intersection on the Lines in the design roads,the point of intersection radius respectively is 300m,250m,300m,500m,900m.Mollifying the curve length is 130m,90m,100 m, 150m,150m. In the profile section design, the entire line has five to change the slope spot,the radius respectively is15000m,8000m,15000m,7000m,20000m. The cross-sectional design one kilometer route as the design object ,a cross-sectional diagram of every 20 meters,the slope gradient of 1:1.5.In the design of bridges and culverts ,the main of the calculation and checking the upper structure of a bridge of 17 meters.Using manual and procedure of the method of combining the pavement structure design in accordance with the regulations. According to road construction ,the construction organization design of construction personnel, construction machinery and engineering quantity arrangement etc.Moreover still use to toget

您可能关注的文档

文档评论(0)

店小二 + 关注
实名认证
内容提供者

包含各种材料

1亿VIP精品文档

相关文档