11常用材料标注规范.doc

11常用材料标注规范

PAGE 10 常用材料标注规范 第 PAGE 9页 共  NUMPAGES 11页 carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout

文档评论(0)

1亿VIP精品文档

相关文档