- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 勐海城房地产公司组织机构框架及部门分配.doc
- 劳动险规避操作手册.doc
- 劳务标管理办法试行定稿.docx
- 勘察计单位管理制度.doc
- 勘查术与工程专业本科培养计划.doc
- 劳动险规避操作手册.doc
- 勘察计企业入桂备案.doc
- 勤算精投资招抗通胀让你不赌也赢.doc
- 勘测计企业税费实务核算的探讨西部财会版.doc
- 勘察计单位管理制度.doc
- 《规模化养殖场生物安全规范 第8部分:牛场》.pdf
- 2025年上海市番茄酱儿童营养辅食配方可行性研究报告.docx
- 《数据知识产权确权指南》.pdf
- 第07讲 理解分析概括文意(复习讲义)(全国通用)(原卷版).docx
- 2025年上海市铝蜂窝板在冷库保温隔热墙板及吊顶领域应用可行性研究报告.docx
- 宜春市宜丰县2024-2025学年中考数学考试模拟冲刺卷含解析.pdf
- 《畜禽养殖主体信息编码技术规程》.pdf
- 第07讲 理解分析概括文意(专项训练)(全国通用)(原卷版).docx
- 《海洋碳库储量调查与评估技术规范 第2部分:盐沼湿地生态系统》.pdf
- 南昌十九中2024-2025学年高三下学期2月月考高三物理试题(含答案).docx
文档评论(0)