- 1、本文档共48页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 48
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 北辰路南延隧道工程施工组织设计.doc
- 医院全应急预案新编.doc
- 医药济学导论.doc
- 医院全管理制度.doc
- 医院务管理制度.doc
- 医药销存管理软件使用说明.doc
- 医院制审评要点.doc
- 医院作制度与人员岗位职责卫生部版.doc
- 医院员绩效考核管理办法.doc
- 医院息化建设现状及未来规划.doc
- 2024年特种作业煤矿安全作业题库检测试题打印及参考答案详解【达标题】.docx
- 2024年华为认证考前冲刺练习附参考答案详解(基础题).docx
- 2024年华为认证考前冲刺练习(考试直接用)附答案详解.docx
- 2025特种作业煤矿安全作业模拟试题及答案详解【易错题】.docx
- 2024年华为认证常考点试卷及答案详解(网校专用).docx
- 2024年华为认证复习提分资料带答案详解(轻巧夺冠).docx
- 2024年华为认证经典例题含答案详解【A卷】.docx
- 2024年特种作业煤矿安全作业题库含完整答案详解(典优).docx
- 2024年华为认证检测卷及答案详解(全国通用).docx
- 2024年华为认证通关题库及答案详解【有一套】.docx
文档评论(0)