- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 8
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts markin
您可能关注的文档
- 南山游食品有限公司策划.doc
- 南师中江宁新校区景观工程施工组织.doc
- 南开会计学综合考试大纲.doc
- 南宁土地整治项目施工资料用表格式清单.doc
- 南京饮管理系统方案书.doc
- 南开学南开金融学基础金融联考考研真题及答案解析.doc
- 南开学春学期《政治经济学》在线作业.docx
- 南开学经济学考研难度大不大.doc
- 南方科大学章程.doc
- 南京程学院机械设计教研室.doc
- 2025福建德化陶瓷产业创新发展研究院招聘笔试历年参考题库附带答案详解.docx
- 2025河南潢川县第三水厂操作工笔试笔试历年参考题库附带答案详解.docx
- 2025山东桓台县金海公有资产经营有限公司面向社会招聘考试有关笔试历年参考题库附带答案详解.docx
- 2025山东济南产业发展投资集团有限公司社会招聘10人笔试历年参考题库附带答案详解.docx
- 会昌县独好文化发展有限责任公司招聘笔试历年参考题库附带答案详解.docx
- 2025山东东明县县内部分企业高层次人才38人笔试历年参考题库附带答案详解.docx
- 2025浙江台州市国有资产投资集团有限公司招聘3人笔试历年参考题库附带答案详解.docx
- 央企中国绿发投资集团有限公司招聘笔试历年参考题库附带答案详解.docx
- 2025山东青岛国信发展(集团)校园招聘笔试历年参考题库附带答案详解.docx
- 2025上海新松江置业(集团)有限公司招聘7人笔试历年参考题库附带答案详解.docx
文档评论(0)