- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 8
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marki
您可能关注的文档
- 卫生关于印三级专科医院评审标准.docx
- 南宁息价,最新最全南宁工程造价信息网期刊下载.doc
- 卫生业管理学》第次作业1.doc
- 南水调大桥施工组织设计.doc
- 卫生市、县级医院常见肿瘤规范化诊疗指南乳腺癌.doc
- 卫生含药监现行有效部门规章目录.doc
- 卫国南居住区三期工程总施工组织方案.doc
- 卫生安全生产职责.doc
- 卫生业管理学》第次作业2.doc
- 卫生改造施工组织设计.doc
- 2025年广西自然资源职业技术学院单招职业倾向性考试题库最新.docx
- 2025年广州卫生职业技术学院单招职业倾向性考试题库1套.docx
- 2025年广西经贸职业技术学院单招职业技能考试题库完整.docx
- 合作伙伴资金预算.pptx
- 2025年广东科学技术职业学院单招职业倾向性考试题库1套.docx
- 2025年广东碧桂园职业学院单招职业技能考试题库完整.docx
- 2025年广东科学技术职业学院单招职业技能考试题库必考题.docx
- 2025年广东省茂名市单招职业倾向性考试题库及答案一套.docx
- 2025年广东省揭阳市单招职业倾向性考试题库完整.docx
- 2025年广东省惠州市单招职业适应性考试题库及答案1套.docx
文档评论(0)