- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
天津商营业执照检网上申报流程操作指南
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 大学会计学职业生涯规划.doc
- 大学农村挂职锻炼暑期社会实践策划.doc
- 大学创业大赛策划书模板.doc
- 大学会计学原理》经典练习题.doc
- 大型结构埋件预埋施工工法.doc
- 大学创业政策如何摸得着.doc
- 大学创业指导手册.doc
- 大型电厂燃烧控制系统分析.doc
- 大学园安全知识竞赛总试题.doc
- 大学创新创业训练计划项目申报说明.doc
- 2023年辽宁省葫芦岛市公开招聘警务辅助人员辅警笔试专项训练题试卷3含答案.docx
- 2024年贵州省黔南自治州公开招聘警务辅助人员辅警笔试摸底测试1卷含答案.docx
- 2022年广西壮族自治区南宁市公开招聘警务辅助人员辅警笔试精编自考题1卷含答案.docx
- 2022年湖北省恩施自治州公开招聘警务辅助人员辅警笔试精编自考题2卷含答案.docx
- 2023年辽宁省抚顺市公开招聘警务辅助人员辅警笔试经典练习卷B含答案.docx
- 2022年福建省福州市公开招聘警务辅助人员辅警笔试必刷经典测试卷1含答案.docx
- 2023年辽宁省营口市公开招聘警务辅助人员辅警笔试必刷经典测试卷2含答案.docx
- 2023年黑龙江省大庆市公开招聘警务辅助人员辅警笔试模拟自测题B卷含答案.docx
- 2024年河南省商丘市公开招聘警务辅助人员辅警笔试必刷测试卷2含答案.docx
- 2021年广西壮族自治区崇左市公开招聘警务辅助人员辅警笔试自考练习卷二含答案.docx
文档评论(0)