- 1、本文档共57页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
学校目施工组织设计
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 如何设与管理销售队伍单选题.doc
- 如何进质量管理体系持续有效运行.doc
- 如何设与管理销售网络.docx
- 如何过培训学习提高个人安全生产管理水平、如何搞好安全生产.doc
- 如何过财务报表分析企业经营绩效时代光华满分试卷.doc
- 如何设高绩效的管理团队森涛培训.doc
- 如何造卓越管理团队.doc
- 如何试中高层管理人员.doc
- 如何造管理者的性格魅力.doc
- 如何造与提升职业竞争力试题答案.doc
- 大众传播理论:范式与流派课件-大众传播的影响:社会心理取向.ppt
- 大学语文(第四版)课件:中国现当代散文.ppt
- 大学英语翻译教程(第五版)课件:翻译技巧(六)重复法.ppt
- 大学英语翻译教程(第五版)课件:汉译英句子主干的确立.ppt
- 大学英语翻译教程(第五版)课件:若干汉语特殊句式的英译(二).ppt
- 程序设计基础及应用(C语言版)课件:利用文件进行数据管理.pptx
- 大学物理学(第二版)课件:机械振动.ppt
- 大学物理学(第二版)课件:热力学基础.ppt
- Web应用系统安全开发课件:使用JavaScript编写网页行为.pptx
- Windows Server操作系统维护与管理(第三版)课件:系统安全管理技术.ppt
文档评论(0)