- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工境保护与水土保持管理方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 新员培训及考核方案.docx
- 新型法水泥生产线管理办法绩效考核.doc
- 新增资综合补贴资金小型农田水利等基础设施建设项目施工方案.doc
- 新增范环保.doc
- 新发农产品批发市场商户经营现状调查研究.doc
- 新工入场安全教育内容.doc
- 新安际医院绿地养护技术措施.doc
- 新屋泡沫混凝土施工方案.doc
- 新天休闲广场规划细则.doc
- 新工水文及水利计算课程设计指导书.doc
- 2025浙江嘉兴海宁市交通投资控股集团有限公司下属公司招聘核减岗位笔试历年参考题库附带答案详解.docx
- 2025湖南麻阳锦发集团招考综合笔试历年参考题库附带答案详解.docx
- 2025浙江省浦江经济开发区集团有限公司浙江浦江上山稻源建设有限公司招聘合同制员工8人笔试历年参考题库附带答案详解.docx
- 2025河北秦皇岛市园博会招聘288人笔试历年参考题库附带答案详解.docx
- 2025福建中检集团康泰安全科技有限公司校园招聘17人笔试历年参考题库附带答案详解.docx
- 2025广西防城港市供销合作社联合社招聘1人笔试历年参考题库附带答案详解.docx
- 2025广东佛冈县农村信用合作联社校园招聘笔试历年典型考题及考点剖析附带答案详解.docx
- 2025中国交建轨道交通事业部招聘14人笔试参考题库附带答案详解.docx
- 2025云南楚雄州姚安县城镇投资开发有限公司招聘笔试参考题库附带答案详解.docx
- 2025北京中国电信政企信息服务事业群交通物流行业事业部招聘笔试参考题库附带答案详解.docx
文档评论(0)