- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
无形产评估的风险与控制
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 施工承包项目的分包管理模式探讨.doc
- 施工案电子版.doc
- 施工梯安全皐理细则.doc
- 施工甲供材的账务处理.doc
- 施工案土地整理.doc
- 施工术管理方案.doc
- 施工段的工程造价控制论文.doc
- 施工法及工艺.doc
- 施工目信息管理.doc
- 施工场安全生产保证体系管理资料.doc
- 分析let s单元56ago2卷纸zheng unit56.pdf
- 塑胶材料其它分类原料pa9t 12.pdf
- md16x16数字媒体切换器设备.pdf
- 者参考项目发起人学科类型单位序列承包商修订页代码顺序典型.pdf
- 届世界天然气大会阿姆斯特丹2006add10288.pdf
- 期测试记录表每周weekly g1g6 journeys tests level 6 lesson26.pdf
- modernize-whitepaper现代化您应用程序白皮书.pdf
- anybackup产品典型案例分析.pdf
- 约克金融工程课程tfeslide32.pdf
- 广州市妇女儿童医疗中心历份教学药历01tjy.pdf
文档评论(0)