- 1、本文档共39页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
智能建筑系统工程施工及规范
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 昆明术管理技术规定最新汇总稿...doc
- 时代华企业规范化管理.doc
- 明星物广场员工手册.doc
- 明渠线施工方案.doc
- 昆明山区装修公司大全.doc
- 易哈会计从业资格《财经法规》考点归纳解析.docx
- 易哈江西下半会计证考试《会计基础》精选试题一.doc
- 易哈北京下半会计证考试会计基础全真模拟题十.doc
- 明珠集团系统变革与创新项目.doc
- 昆明修公司一览表.doc
- 2025年人教版一年级上册数学期中综合检测试卷及答案 (1).pptx
- 【9历期末】安徽省安庆市2024-2025学年九年级上学期期末历史试题(含解析).docx
- 【9历期中】安徽省淮北市“五校联考”2024-2025学年九年级上学期期中历史试题(含解析).docx
- 2025年部编版五年级上册语文第七单元综合检测试卷及答案.pptx
- 2025年人教版九年级上册数学第二十四章圆【基础提升专题】圆中利用转化思想求角度.pptx
- 2025年人教版九年级上册数学第二十一章综合检测试卷及答案.pptx
- 2025年人教版一年级上册数学第五单元综合检测试卷及答案 (1).pptx
- 2025年人教版一年级上册数学期末质量监测试卷及答案 (1).pptx
- 【9历期末】安徽省滁州市天长市2024-2025学年部编版九年级上学期1月期末历史试题.docx
- 2025年部编版九年级上册历史知识清单.docx
文档评论(0)