- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
森林火、消防安全教育与培训制度
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 某高住宅施工组织设计.doc
- 某高商用写字楼建筑结构设计及信息技术在施工中应用陆卫良.doc
- 某高建筑加层改造工程钢结构构件吊装方案.doc
- 某食股份有限公司成立周庆典.doc
- 某高建筑工程施工组织设计.doc
- 某项场平大型土石方工程施工方案.doc
- 某高计算机实验室管理系统设计.doc
- 某餐管理公司绩效考核管理体系设计方案.doc
- 染色水处理工程及工艺分析.doc
- 查工作站江汉大学.doc
- 智能推荐系统:用户兴趣建模_(12).推荐系统中的冷启动问题.docx
- 酒店管理与服务:酒店资源调度与优化_(4).餐饮资源调度与优化.docx
- 智能推荐系统:用户兴趣建模_(3).数据收集与预处理.docx
- 智能推荐系统:用户兴趣建模_(1).智能推荐系统概述.docx
- 酒店管理与服务:酒店安全监控_(1).酒店安全管理概述.docx
- 酒店管理与服务:酒店资源调度与优化_(7).酒店库存管理与成本控制.docx
- 酒店管理与服务:酒店预订系统优化_(4).用户体验设计与优化.docx
- 酒店管理与服务:酒店预订系统优化_(8).数据安全与隐私保护.docx
- 智能推荐系统:协同过滤推荐_(13).协同过滤推荐与隐私保护.docx
- 智能推荐系统:协同过滤推荐_(14).推荐系统的实时性挑战.docx
文档评论(0)