- 1、本文档共38页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
水利电工程监理专业
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 228
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mar
您可能关注的文档
- 武陵风景名胜区天子山旅游镇总体规划文本.doc
- 武汉通职业学院.doc
- 残疾工作通讯.doc
- 每日卡奖励离职管理面面观离职面谈流程梳理.pdf.doc
- 母子司人力资源管理制度.doc
- 武汉铁路职业技术学院单招模拟题工程造价专业.docx
- 武陵区节水型社会建设规划.doc
- 每个售人员负责的个重要网站.doc
- 比亚多元化战略分析.doc
- 比亚公司成长战略研究.doc
- 2022-2023学年山东省临沂市蒙阴县实验中学联考数学试题试卷含解析.doc
- 2022-2023学年安徽舒城桃溪中学高考适应性测试(3月1日)数学试题含解析.doc
- 2022-2023学年安徽省青阳县第一中学高三第五次月考数学试题试卷数学试题含解析.doc
- 牛呼吸道疾病综合征病原PCR检测技术规范.pdf
- 大庆市野生鸟类疫源疫病监测技术规范.pdf
- fresh线性代数作业解决问题.pdf
- 005a1630模拟电子技术基础教学大纲.pdf
- 2022-2023学年安徽省阜阳市临泉县第一中学高三第二次高考模拟考试数学试题试卷含解析.doc
- 2022-2023学年山东省临沂市兰陵县第一中学高三5月联考数学试题含解析.doc
- samsung专有内容可能会更改electrical part list电气零件清单.pdf
文档评论(0)