- 1、本文档共18页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水利程建设安全生产监督检查导则
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 18
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 毕业文参考选题目录工商;会计;物流专业.doc
- 毕业文产件定位支座零件工艺规程及关键工位加工夹具设计..doc
- 比亚汽车市场营销策略研究.doc
- 毕业文指导安排届物流管理专业.doc
- 毕业文我国中小企业营销人员激励与约束机制研究.doc
- 比亚投资分析.doc
- 毕业文数控车床零件加工工艺的分析与程序编写.doc
- 毕业文浅谈绿色贸易壁垒对中国外贸的影响.doc
- 毕业文浅析加强安全生产的重要性.doc
- 毕业文物流管理范文.doc
- 南开大学25年春季新学期《新闻采访与写作》在线作业二.docx
- 南开大学25年春季新学期《信息隐藏技术》在线作业二.docx
- 南开大学25年春季新学期《信息隐藏技术》在线作业三.docx
- 南开大学25年春季新学期《信托与租赁》在线作业三.docx
- 南开大学25年春季新学期《信息处理技术》在线作业三.docx
- 南开大学25年春季新学期《信息处理技术》在线作业一.docx
- 南开大学25年春季新学期《信息资源管理》在线作业二.docx
- 2024年新北师大版一年级上册数学教学课件 第三单元 整理与分类 第3课时 一起来分类(2).pptx
- 南开大学25年春季新学期《信息资源管理》在线作业三.docx
- 南开大学25年春季新学期《信息隐藏技术》在线作业一.docx
文档评论(0)