- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
浅析子商务对国际贸易影响论文
┊
┊
┊
┊
┊
┊
┊
┊
┊
┊
┊
┊
┊
装
┊
┊
┊
┊
┊
订
┊
┊
┊
┊
┊
线
┊
┊
┊
┊
┊
┊
┊
┊
┊
┊
┊
┊
┊
安徽工业大学学年论文
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawi
您可能关注的文档
- 河道化的施工方案.doc
- 油库备安全管理制度.doc
- 河道淤施工方案.doc
- 河道防工程管理三维仿真系统的设计与开发.docx
- 河南速绩效考核管理制度.doc
- 油库备安全管理制度1.doc
- 油挡压工艺课程设计.doc
- 河道墙施工方案.doc
- 河源度小企业会计人员继续教育试题及答案.doc
- 河道位工程鉴定书.doc
- 2025年秋沪粤版物理八年级上册同步课件.pptx
- 2025年秋季冀教版英语六年级上册同步课件.pptx
- 2024年秋季新人教版七年级上册生物课件 第二单元 第三章大单元整体设计.pptx
- 2024秋新人教版数学七年级上册教学课件 4.2 整式的加法与减法 第1课时同类项与合并同类项.pptx
- 2025年秋季苏科版物理九年级上册同步教学课件.pptx
- 2025年秋季苏科版物理九年级上册同步课件.pptx
- 2024秋新人教版数学七年级上册教学课件 5.2 解一元一次方程 第3课时去括号.pptx
- 2024秋新人教版数学七年级上册课件 4.2 整式的加法与减法 第2课时去括号.pptx
- 近代中国反侵略、求民主的潮流.pptx
- 2025年度全国一级建造师执业资格考试报考条件和现场审核网上报名+专业对照.doc
文档评论(0)