- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
涂料产企业安全技术规程
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 浆砌护坡施工方案最后的.doc
- 测绘全生产管理修.doc
- 测绘业度统计表一测绘单位信息.doc
- 测绘务新农村建设的战略研究.doc
- 测试工程测量专项施工方案.doc
- 测绘工程测量论文1.doc
- 测绘程定额测绘成本预算定额.docx
- 测试术复习资料第二章.doc
- 浅谈面设计幽默广告的表现力.doc
- 测试目两门:大学语文物流管理专业综合知识.doc
- 2024年度炭素煅烧工二级真题及答案完整版(答案在末尾).docx
- 二升三暑假晨读必备三上语文生字组词造句(11页).pdf
- 2024考试炭素煅烧工四级真题考试(附答案).docx
- 小学科学教育中AI资源整合与探究式学习模式创新研究教学研究课题报告.docx
- 小学生城南旧事课件.pptx
- (最新)理论考试炭素煅烧工四级题库附答案(答案在末尾).docx
- 初中物理实验操作能力提升策略与实验教学方法创新教学研究课题报告.docx
- 汽车制造企业供应链协同创新与绩效提升的实证研究教学研究课题报告.docx
- 《在线教育平台互动功能对学生学习投入与学习成果的关系研究》教学研究课题报告.docx
- 2025年循环经济园区产业协同发展模式产业协同产业协同发展模式研究报告.docx
文档评论(0)