- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
舟山商局营业执照检网上申报流程最新版
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 自动制实验指导书1.doc
- 自动制实验指导书.doc
- 自动制第九章传递函数的状态空间实现.doc
- 自动制系统的数学模型.doc
- 自动制造系统试卷自考资料.doc
- 自动电力系统方向计算机控制课程设计任务书.doc
- 自动水灭火系统施工及验收规范GB.doc
- 自动制原理第一章绪论.doc
- 自动的喷水灭火装置技术规范.doc
- 自动的喷水灭火装置认证技术规范.doc
- 2025-2030中国集装箱租赁行业市场发展分析及前景趋势与投资机会研究报告.docx
- 2025年新疆维吾尔自治区伊犁州伊宁县高三下学期3月联考数学试卷.docx
- 2025-2030中国集装箱租赁行业市场深度调研及投融资与发展战略研究报告.docx
- 2025-2030中国集装箱称重系统行业市场发展趋势与前景展望战略研究报告.docx
- 2025年新疆维吾尔自治区伊犁州伊宁县高三下学期第八周周测数学试卷.docx
- 二零二五年科技园区建设投资合作协议书3篇.docx
- 小学生国旗下讲话主题.doc
- 2025-2030中国集装箱船行业市场现状供需分析及投资评估规划分析研究报告.docx
- 2025-2030中国集装箱称重系统行业市场现状供需分析及投资评估规划分析研究报告.docx
- 2025-2030中国集装箱船行业市场发展趋势与前景展望战略研究报告.docx
文档评论(0)