- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
金融业毕业论文
本团队长期从事论文写作与发表服务,专科本科论文300起,详情伍老师扣扣:三零零四零九八三
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 10
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Co
您可能关注的文档
- 采购供应链运营管理吴诚老师.doc
- 采购同管理与法务风险规避.doc
- 采购同管理与规范.doc
- 采购务流程及管理制度.doc
- 采购员职业标准和能力素质要求.doc
- 采购工作指导手册.doc
- 采购工作制度.doc
- 采购供应商《采购与供应链管理》大纲吴诚老师.doc
- 采购度总结.doc
- 采购效考核管理制度.docx
- 自考专业(计算机信息管理)考前冲刺试卷附完整答案详解(网校专用).docx
- 出租车司机管理课件.pptx
- 太阳能LED路灯系统设计与应用.pptx
- 自考专业(计算机信息管理)考前冲刺试卷附参考答案详解【培优B卷】.docx
- 自考专业(计算机信息管理)考前冲刺试卷附参考答案详解(研优卷).docx
- 大语言模型在中学历史学科应用的成效与评估分析.docx
- 自考专业(计算机信息管理)考试历年机考真题集及1套参考答案详解.docx
- 自考专业(计算机信息管理)考试历年机考真题集及完整答案详解【历年真题】.docx
- 轻卡顶盖外板冲压工艺优化与模具设计方法研究.docx
- 高新技术企业研发经费内审数字化转型路径探索.docx
文档评论(0)