- 1、本文档共27页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
金融机背景下我国珠三角制造业发展对策
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 22
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking inst
您可能关注的文档
- 采购采购流程管理制度PU.doc
- 酒管理国际星级酒店集团家族最全介绍!.docx
- 重庆中学度九级下期半期考试思想品德试卷.doc
- 重大害因素控制措施.doc
- 重庆修公司一览表.doc
- 重庆创职业学院《工厂电气控制技能训练》课程标准.doc
- 重庆内装修公司.doc
- 重庆创职业学院《数控车工技能中级》实训课程标准.doc
- 重庆代广场整体运营方案.doc
- 重庆主城区房地产市场周动态...doc
- 2025数字货币与金融安全:风险评估与防范策略报告.docx
- 2025数字人民币跨境支付技术挑战与安全解决方案全面剖析.docx
- 金融反洗钱技术创新:2025年行业应用与监管政策研究报告.docx
- 医养结合养老机构运营政策环境与法规解读2025年报告.docx
- 2025年下沉市场消费金融信贷业务创新与监管政策研究.docx
- 2025年老年教育课程设置与终身学习理念融合实践策略实践探索.docx
- 生态旅游2025年发展规划与管理中的旅游生态旅游区旅游基础设施建设研究报告.docx
- 免疫治疗在自身免疫性神经病变中的应用进展报告.docx
- 数控机床智能化升级关键技术研究报告:2025年行业应用前景.docx
- 聚焦2025:农业产业化龙头企业发展模式与农村基础设施建设投资带动效应报告.docx
文档评论(0)