- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
钳工位危险有害因素辨识卡
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 金碟务软件教程仓存管理.doc
- 金融合练习题及答案.doc
- 金融含:保险学专业攻读硕士学位.doc
- 金融农和财政支农的协同效应分析.doc
- 金融场习题加答案.doc
- 金融参考书名.doc
- 金融业论文范文.docx
- 金融场复习重点.doc
- 金融场学复习.doc
- 金融品创新与服务.doc
- 2025年押题宝典演出经纪人之《演出市场政策与法律法规》题库(夺冠系列)附答案详解.docx
- 2025年整理演出经纪人之《演出经纪实务》题库含完整答案详解(网校专用).docx
- 2025年押题宝典演出经纪人之《演出市场政策与法律法规》题库附完整答案详解(精选题).docx
- 2025年演出经纪人之《演出市场政策与法律法规》押题练习试卷及完整答案详解【夺冠系列】.docx
- 2025年演出经纪人之《演出市场政策与法律法规》常考点及参考答案详解(新).docx
- 2025年押题宝典演出经纪人之《演出经纪实务》题库带答案详解.docx
- 2025年押题宝典演出经纪人之《演出市场政策与法律法规》题库附答案详解【完整版】.docx
- 2025年演出经纪人之《演出市场政策与法律法规》常考点及参考答案详解(实用).docx
- 2025年押题宝典演出经纪人之《演出市场政策与法律法规》题库附参考答案详解【a卷】.docx
- 2025年演出经纪人之《演出市场政策与法律法规》模拟考试题库B卷完整答案详解.docx
文档评论(0)