- 1、本文档共17页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
银行从业资格认证考试《风险管理》一
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 针对学生的销售培训材料.doc
- 鑫宁务酒店的案例及解决办法.doc
- 金融险基础会计教案模块一.doc
- 金边香苑《销售百问》.doc
- 金融课程介绍.doc
- 钢以深入推进卓越绩效为导向的管理改进.doc
- 金鹿空电子客票网站销售保险说明.doc
- 金鹰X定增号资产管理计划资产管理合同标注初稿.doc
- 针对尔玛公司管理信息系统的论述.doc
- 鑫拓展培训资料.doc
- 2024-2025学年小学信息技术(信息科技)四年级下册电子工业版(宁夏)教学设计合集.docx
- 文化娱乐消费者行为研究:2025年市场细分与市场细分策略创新报告.docx
- 连锁餐饮中央厨房食品安全风险评估与风险控制研究报告.docx
- 即时配送行业2025年配送路径优化与物流技术创新报告.docx
- 汽车零部件供应链风险管理及优化策略研究报告.docx
- 时尚行业2025年企业数据资产价值评估与个性化定制报告.docx
- 2025年景区改造项目对旅游业可持续发展影响研究报告.docx
- 婴幼儿配方食品营养配方优化对儿童健康成长影响研究报告.docx
- 工业互联网平台与AR交互技术:2025年智能医疗解决方案深度解析.docx
- 影视行业2025年工业化生产标准体系构建与产业政策创新策略报告.docx
最近下载
- 2025形势与政策-加快建设社会主义文化强国.pptx
- 人教版(2025)七年级下册Unit1Animal FriendsSection B How are animals part of our lives Section B 1a~2b课件+音频(共3.pptx VIP
- 110kv变电站继电保护毕业设计.doc VIP
- 公路隧道工程施工.pptx
- 电信行业运营商业务连续性保障方案.doc VIP
- 生态酒店设计分析.pptx
- GB∕T 702-2017 热轧钢棒尺寸、外形、重量及允许偏差(高清版).pdf
- 2025-2030年中国采血器产业运行动态分析及投资战略咨询报告.docx
- 江苏旅游资源的特征与分类及开发思考.pptx VIP
- 海南大学2022-2023学年《细胞生物学》期末考试试卷(B卷)附参考答案.docx
文档评论(0)