- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
单屏红外框多点触控系统1
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 刘书记在精神文明建设会上的讲话压缩.doc
- 刘懿秘书实训方案.doc
- 刘萍的文献综述.doc
- 创新基金项目申报材料编写信息点1.doc
- 创新基金项目申报材料编写信息点.doc
- 刘礼瑫论文第二稿拟为终稿修改意见.doc
- 刘鸿儒五道口创始人.doc
- 创新基金申请表.doc
- 创新基金指南.doc
- 初级经理的角色认知.doc
- 2025校园反诈宣传活动总结(通用7篇).pdf
- 云南农垦集团有限责任公司2023-2024年校园招聘公开引进高层次人才笔试(共100题)答案完整题库.docx
- 山东省青岛市高新区2025-2026学年七年级下学期期中地理试题.pdf
- 浙江省嘉兴市第一中学、湖州中学2025高二物理下学期期中试题(含解析).pdf
- 2025年鲁教版(五四制)六年级英语上册Unit 6 测试题(含答案).pdf
- 2025年需求分析师的职责(15篇).pdf
- 2025年食品安全自查规章制度(共).pdf
- 北京外企服务集团有限责任公司春季招聘24人高频100题难、易错点模拟试题附带答案题库附答案(考试直接.docx
- 信华科技(厦门)有限公司2023-24年毕业生专项招聘生产储备岗100题模拟试题附带答案完整题库附答.docx
- 内部使用卧龙控股集团招考聘用6人(高频重点提升专题训练)共100题附带答案大全(达标题).docx
文档评论(0)