- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
卒中病历模板
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 动脉瘤性蛛网膜下腔出血的治疗指南ASA 版 上.doc
- 助理营销师理论复习资料[].doc
- 劳动保护资料.doc
- 劳动保护台帐二.doc
- 助理物流师复习师.doc
- 劳动保护台帐四.doc
- 劳动合同卢文杰.doc
- 助理物流师理论知识.doc
- 动态系统的稳定性.doc
- 劳动法已打印.docx
- 2023 中国人工智能系列白皮书--人工智能原理.pdf
- 20230728-AI+金融:大模型引爆金融科技革命.pdf
- 2020家具品牌x海航春节事件营销创意方案.pdf
- 2021年双11达人营销备战策略洞察及资源推荐.pdf
- 建筑工程图集 DB22T_5039-2020_预拌混凝土_砂浆_及沥青混凝土企业试验室配置标准.pdf
- 2016全球人工智能发展报告·投资与融资篇.pdf
- 可燃和有毒气体报警系统热点问题解析(二)-林洪俊2022.04.pdf
- SAP-BW-BI-培训教程(经典案例).pdf
- 2024年中国AI Agent 行业研究报告:大模型时代的APP,探索新一代人机交互及协作范式.pdf
- 数据资产年度运营报告 2023.pdf
文档评论(0)