- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
国际公法形成答案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 吉林大学 农学部硕士研究生专业目录.doc
- 吉林大学与山东省滨州畜牧兽医研究院.doc
- 吉林公务员申论写作:人民日报常用语【终结篇】.doc
- 合肥师范学院大学生暑期社会实践活动实施方案.doc
- 同声传译系统的设计.doc
- 名词大宗商品.docx
- 后仔仪头生猪项目建议书.doc
- 合金管T合金管.doc
- 后省钱达人.doc
- 向通学会察言观色抓住客户心理.doc
- 常见危大工程施工方案管理(可编辑).pptx
- FY25暑假初二A09 正比例函数【教师版】 .pdf
- 第02讲 函数的性质:单调性、奇偶性、周期性、对称性、最值(十六大题型)(讲义)(有解析).docx
- 连锁餐饮原材料物流配送问题优化方案设计2000字 .pdf
- 2024年四川省非金属地质调查研究所招聘考试真题.docx
- 专题02 不等式与复数(练习)(有解析).docx
- 专题01 集合和常用逻辑用语(讲义)(有解析).docx
- 制冷装置在消耗能源方面存在的问题及建议4900字【论文】 .pdf
- 2024年恩施州巴东县农业农村局公益性岗位招聘真题 .pdf
- 标准化在涉案财物管理创新中的应用与实践 .pdf
文档评论(0)