- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大专病理学重点总结doc
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 22
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 土地资源学期末复习肖智.doc
- 土地补偿款如何征税[].doc
- 土地利用现状分类一王川.doc
- 土建计量历知识点.doc
- 圣诞餐饮计划.doc
- 圣诞节祝福语 圣诞节贺卡祝福语.doc
- 圣诞英文祝福短信.doc
- 土木岩土类常用外文全文文摘数据库简介.doc
- 在全区服务业发展大会上的讲话摘要.doc
- 圆柱外螺纹的画法.doc
- 计量规程规范 JJF 2153-2024强脉冲光治疗仪校准规范.pdf
- 《JJF 2153-2024强脉冲光治疗仪校准规范》.pdf
- JJF 1176-2024(0~2 300) ℃钨铼热电偶校准规范.pdf
- 《JJF 1176-2024(0~2 300) ℃钨铼热电偶校准规范》.pdf
- 计量规程规范 JJF 1176-2024(0~2 300) ℃钨铼热电偶校准规范.pdf
- JJF 2154-2024亚低温治疗仪校准规范.pdf
- 计量规程规范 JJF 2154-2024亚低温治疗仪校准规范.pdf
- 《JJF 2154-2024亚低温治疗仪校准规范》.pdf
- JJF 2180-2024婴儿辐射保暖台校准规范.pdf
- 计量规程规范 JJF 2180-2024婴儿辐射保暖台校准规范.pdf
文档评论(0)