- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
岳阳楼区手机报修改稿付
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 学生选读专业书目.doc
- 学第一学期细胞生物学B卷.doc
- 宁夏回族自区 花儿.doc
- 学第一学期细胞生物学B卷1.doc
- 学论文修改一周目.doc
- 宁波大学甲A篮球联赛策划书.doc
- 孩之宝玩具全标准.doc
- 宁波大学 商学院毕业论文《星巴克品牌竞争力研究》.doc
- 学高中地理 以畜牧业为主的农业地域类型同步学案 新人教版必修.doc
- 宁夏水资源供求对策研究十一五最终成果.doc
- 2024至2030年中国人造棉面料行业投资前景及策略咨询报告.docx
- 重庆市渝中区遴选公务员2024年国家公务员考试考试大纲历年真题10340笔试历年典型考题及解题思路附.docx
- 2024至2030年中国甲基苯乙酮行业深度调研及发展预测报告.docx
- 2024至2030年中国羚羊角类饮片行业深度调查与前景预测分析报告.docx
- 重庆市面向中国农业大学定向选调2024届大学毕业生2024年国家公务员考试考试大纲历年真题14笔试历.docx
- 重庆市面向西北工业大学定向选调2024届大学毕业生00笔试历年典型考题及解题思路附答案详解.docx
- 中国不动杆菌感染治疗药行业市场现状分析及竞争格局与投资发展研究报告2024-2029版.docx
- 2024至2030年全球与中国ETL软件市场现状及未来发展趋势.docx
- 初中八年级(初二)生物下册期末考试1含答案解析.docx
- 干簧式继电器项目申请报告.docx
文档评论(0)