- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 收官季电动车品牌口碑指数榜.doc
- 操作系统实验实验.doc
- 操作系统实验指导书计算机专业.doc
- 放射质控检查标准和评审方法 分.doc
- 教你与客户成交的种技巧.doc
- 政治七级下册知识点总结.doc
- 教体局总结打算改后.doc
- 探寻台湾名企成功模式之旅第二季.doc
- 教你如何改回经典输入法。以及win输入法感受.docx
- 教学大纲商品学.doc
- 小学教科研工作计划.docx
- 2025届共美联盟高三2月生物试题模拟试题含解析.doc
- 2025届福建省仙游第一中学高三年级总复习质量检测试题(三)生物试题试卷含解析.doc
- 2025届福建省永春一中等四校中学高中毕业班质量检查(Ⅱ)英语试题含解析.doc
- 2025届甘肃省定西市陇西县第二中学高三年级五月第一次模拟英语试题试卷含解析.doc
- 2025届甘肃省静宁县一中高三下学期第二次校模拟考试英语试题含解析.doc
- 2025届福建省厦冂双十中学生物试题高考模拟题解析(精编版)含解析.doc
- 2025-2025安徽科学出版社七年级信息技术下册教学计划.docx
- 湖南美术出版社四年级下册美术教学计划.docx
- 2025小学田径队训练计划.docx
文档评论(0)