- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
最新电动车品牌口碑指数榜 新日雅迪爱玛及绿源
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 无公害畜产品产地认定与产品认证申请书新版.doc
- 方案篇蒙氏教具M.doc
- 旅行登山鞋的秘密如何选择户外鞋.docx
- 无线电台站的呼号指配审批办事指南.doc
- 无缝管【无缝管厂家】.docx
- 无线监控解决方案ITS.doc
- 无线远程监控说明.doc
- 日化专营店如何提高赢利能力.doc
- 无线水温检测系统最新.doc
- 日照日语翻译服装类术语.doc
- 世界银行-肯尼亚参与式预算的演变、实践和影响——肯尼亚责任下放计划.docx
- 小升初形容词的比较级最高级.docx
- 小升初英语阅读理解解题方法.docx
- 小托福词汇分析和总结.docx
- 小升初形容词副词讲义.docx
- 育儿词汇集合点职业德语语言treffpunkt beruf儿童看护.pdf
- 详解1 spss中文汉化版iso alscal.pdf
- fabrication of fully transparent nanowire trstors for and flexible electronics制造用于透明柔性电子产品完全纳米线晶体管.pdf
- 介绍参考文献flint et al principles of virology病毒学教程gr01intr.pdf
- 控制网络模块手动导入方式shek.pdf
文档评论(0)