- 1、本文档共14页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
杭政储安装商务用房二期绿谷杭州浙商创新发展中心项目图纸会审
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 有线无线通信系统.doc
- 有趣鞋带系法大全图解.doc
- 服装品牌竞争力.doc
- 服务细则条有问笔答.doc
- 服装成衣产业在中国大陆通路与品牌经营之探讨龙笛服饰个案分析doc.doc
- 有效沟通与协作D.doc
- 有限元分析ANSYS从入门到实战.doc
- 服装标识知识介绍[].doc
- 服装设计二教案.doc
- 望江教育信息第期.doc
- GB/T 40096.6-2024就地化继电保护装置技术规范 第6部分:母线保护.pdf
- 《GB/T 40096.6-2024就地化继电保护装置技术规范 第6部分:母线保护》.pdf
- GB/T 43980-2024口译服务 医疗口译要求.pdf
- 中国国家标准 GB/T 43980-2024口译服务 医疗口译要求.pdf
- 《GB/T 43980-2024口译服务 医疗口译要求》.pdf
- GB/T 17215.301-2024电测量设备(交流) 特殊要求 第1部分:多功能电能表.pdf
- 《GB/T 17215.301-2024电测量设备(交流) 特殊要求 第1部分:多功能电能表》.pdf
- 中国国家标准 GB/T 17215.301-2024电测量设备(交流) 特殊要求 第1部分:多功能电能表.pdf
- 中国国家标准 GB/Z 43973-2024非介入式负荷监测(NILM)系统用感知装置.pdf
- GB/Z 43973-2024非介入式负荷监测(NILM)系统用感知装置.pdf
文档评论(0)