- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
欧洲热门专业及院校推荐
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 机自二本人任务书.doc
- 机电一级建造师 实务教材 错误整理.doc
- 机票业务知识新.doc
- 机电一体化毕业设计论文数控机床润滑系统的设计.doc
- 李河等:当代中国文化政策.doc
- 李丽桃 毕业论文.doc
- 李亮物联网关键技术及应用研究.doc
- 李子酒 美食杰.docx
- 李阳疯狂美范文篇.doc
- 条 超级实用健康文摘.doc
- 雪茄行业市场发展分析及投资战略研究报告(2024-2030).docx
- 钾肥行业兼并重组机会研究及决策咨询报告.docx
- 2024-2030年生鲜商超行业市场深度分析及竞争格局与投资潜力研究报告.docx
- 风电叶片行业市场发展分析及发展前景与投资机会研究报告.docx
- 2024-2030年中国吹塑机行业发展趋势与投资战略研究报告.docx
- 2024-2030年通信行业发展分析及投资战略研究报告.docx
- 食品安全员能力考核试题-含答案.doc
- 2024-2030年中国养老产业行业市场深度分析及竞争格局与投资发展前景研究报告.docx
- 2024-2030年中国大豆保健食品行业市场发展分析及发展趋势与投资前景研究报告.docx
- 专升本高等数学二(多元函数微分学)模拟试卷1(题后含答案及解析).doc
文档评论(0)