- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 纺织服装强.doc
- 线性系统的时域分析法第讲.doc
- 组织行为学复习资料[].doc
- 细化物流配送中心的基本作业流程.doc
- 组织行为理论与实务复习资料.doc
- 织金国际溶洞文化节总体方案最终稿.doc
- 细目表三级.doc
- 线性系统的时域分析法第六讲.doc
- 终端从G网小区重选到TD小区鉴权失败的解决案例陈攀.doc
- 组织行为学综述一.doc
- 《流域生态补偿政策与环境保护法律法规的衔接与完善》教学研究课题报告.docx
- 小学英语教学:校园周边交通标识的跨文化交际与理解论文.docx
- 小学生绘画教学中的年龄阶段教学目标与内容设计论文.docx
- 高中生物教学中学生生物学实验创新能力的培养研究论文.docx
- 宠物粪便处理与社区环保产业发展瓶颈分析研究论文.docx
- 小学阶段:城市垃圾分类政策对小学生英语阅读能力的培养研究论文.docx
- 太阳能热水器在北方地区的效能实验分析论文.docx
- 小学生参与图书馆图书更新的实践与效果评估论文.docx
- 基于核心素养的高中物理教学评价对学生学习效果的评估研究论文.docx
- 高中数学建模教学策略与评价论文.docx
文档评论(0)