- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《项目管理教程》案例分析与讨论 湖北汽车工业学院经济管理学院
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, b
您可能关注的文档
最近下载
- 1.1 细胞 ( 教案) 六年级上册科学青岛版.docx VIP
- 护理病人签署知情同意规范.pptx VIP
- 2025年福建省中考英语真题试卷完全解读.docx VIP
- 联想笔记本电脑环境标志产品认证证书2022年版.docx VIP
- 标准化变电站建设实施规范(二次设备名称及标识).pdf VIP
- Unit1 Happy Holiday Section A(1a-1d)课件人教版英语八年级上册.pptx VIP
- 监理工作报告制度.doc VIP
- 2020新上外版高中英语选择性必修一Unit1 Reading A Learning is Everywhere 课件.pptx VIP
- 部编高教版2023·职业模块 中职语文 语文职业模块 1.1《七律二首·送瘟神》课件.pptx VIP
- 0-3岁婴幼儿行为观察与分析第四章 0~3岁婴幼儿动作发展观察.pptx VIP
文档评论(0)