- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
高层楼宇建筑电气节能技术研究王亮
PAGE - 26 -
PAGE - 25 -
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE - 26 -
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Colo
您可能关注的文档
- 非常有用医学生学习方法.doc
- 非上海生源普通高校应届毕业生进沪就业户籍评分办上海户口打分标准.doc
- 非晶硅太阳能电池板和发电机组价格.docx
- 面向“后”消费群体的营销策略研究.doc
- 非常有用医学生学习方法.doc
- 青少科技体验馆可行性分析.docx
- 集食惠产品推荐:三清方礼盒装银耳饮料罐箱.docx
- 音乐学音乐教育毕业论文《浅谈歌唱中气息的重要性》.doc
- 鞋带的种系法图解.doc
- 韩国拼色浅口粗跟单鞋.docx
- 建设工程质量安全管理标准化图集(安全篇2024版)ppt230页.pptx
- 《油气储存企业安全风险评估细则(2025年修订)》解读.pptx
- 2025年《危大工程专项施工方案严重缺陷清单专题培训》ppt120页_1230.pptx
- 中建分部分项检验批划分方案、资料目录策划编制要点ppt75页.pptx
- 某项目智慧工地示范项目应用成果介绍75页_5843.pptx
- 2025年中国风筝无人机LED夜光编队编程师应聘面试模拟题及答案.doc
- 2025年中国鞍钢集团招聘笔试题库附答案.doc
- 2025年中国鞍钢集团招聘面试预测题及答案.doc
- 临床器械实验培训试题及答案2025年版.docx
- 中石化《两个责任》解读分析.ppt
文档评论(0)