- 1、本文档共32页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
avay综合布线解决方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe. PAGE 30
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking inst
您可能关注的文档
- ,中国古史复习提纲.doc
- A 决胜端 提升业绩 1.doc
- A 决胜端 提升业绩.doc
- ABCH型营销模式.doc
- ACUR品牌推广策略.doc
- A 中图征文: 面向信息素养教育的数字目录学发展研究与服务创新 重庆图书馆 王小全.doc
- Afjpen做老板更要做大赢家.doc
- andrid多线程讲解 看图理解.doc
- ANSY使用问答精华.doc
- ANSY结构分析指南 疲劳.doc
- 技术培训生产信息符号识别.pdf
- 更少乐趣付款也许就业类.pdf
- 四周二十一证券.pdf
- joe decapua著名艾滋病毒倡导组织说强化.pdf
- 文稿分析ab initio paper 1 sl markscheme西牙语.pdf
- 模块处理记录batches批次.pdf
- 参考介绍操作灯02 marled.pdf
- sigma-b3436共aldrich安全数据表.pdf
- digital booklet-me before you original motion picture soundtrack数字小册子在原始电影原声带之前.pdf
- phagocytosis elegant complexity吞噬作用优雅复杂性.pdf
最近下载
- 小学四年级四则运算500题.docx VIP
- 环境保护管理体系与措施.doc VIP
- 波音777X折叠式翼梢结构设计及仿真.docx
- 2025重庆江北区郭家沱街道办事处招聘1人笔试备考试题及答案解析.docx VIP
- 05G359-3悬挂运输设备轨道标准图集.pdf VIP
- 7.动物行为与环境变化 说课稿-2023-2024学年科学六年级下册青岛版.docx VIP
- 2025抖音电商品牌服饰秋冬趋势报告.pdf VIP
- 数字化技术在“思想道德与法治”课程中的应用与教学模式创新.docx VIP
- 邮政面试经典题目及答案.docx VIP
- 2025中国南水北调集团水网发展研究有限公司招聘6人模拟试卷含答案解析.docx VIP
文档评论(0)