- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
BR冰淇商业策划书
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation loc
您可能关注的文档
- ,中国古史复习提纲.doc
- A 决胜端 提升业绩 1.doc
- A 决胜端 提升业绩.doc
- ABCH型营销模式.doc
- ACUR品牌推广策略.doc
- A 中图征文: 面向信息素养教育的数字目录学发展研究与服务创新 重庆图书馆 王小全.doc
- Afjpen做老板更要做大赢家.doc
- andrid多线程讲解 看图理解.doc
- ANSY使用问答精华.doc
- ANSY结构分析指南 疲劳.doc
- 2025年中国后通风窗数据监测报告.docx
- 2025浙江台州市天台县交通运输局下属事业单位选聘2人考试备考试题及答案解析.docx
- 2025重庆市綦江区人民政府三江街道办事处招聘公益性岗位人员1人考试备考试题及答案解析.docx
- 2025年中国逆变式手工电弧焊机数据监测研究报告.docx
- 2025年中国抽屉把手数据监测研究报告.docx
- 2025年杭州市拱墅区武林街道办事处招聘考试笔试试题.pdf
- 2025年中国轻型塑料托盘数据监测研究报告.docx
- 2025浙江金华金开招商招才服务集团有限公司招聘劳动合同制(阶段性)工作人员1人考试备考试题及答案解析.docx
- 2025十堰房县消防救援大队面向社会公开招聘政府专职消防员考试备考试题及答案解析.docx
- 2025年深圳市南山区教育幼教集团招聘考试笔试试题.pdf
文档评论(0)