- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- COD在监测仪 水质分析仪.doc
- CPA综练习答案.doc
- ClouOne云平台一体化解决方案.docx
- CPI影因素分析.doc
- CRM结论文 浅谈红罐王老吉的品牌定位.doc
- crm国外研究情况.doc
- CW系列床改数控机床的PLC编程.doc
- CEO不掉以轻心的合同风险防范常识.doc
- C程序设实验指导书.doc
- C语言与计模式.docx
- 2024年12月广东江门市台山出入境边防检查站编制外人员公开招聘1人笔试历年典型考题(历年真题考点)解题思路附带答案详解.doc
- 2025年02月2024贵州毕节市农业农村局人才“蓄水池”第二批岗位引进人才笔试历年典型考题(历年真题考点)解题思路附带答案详解.doc
- 2025年02月山西阳曲县统计局公开招聘劳动力调查人员2人笔试历年典型考题(历年真题考点)解题思路附带答案详解.doc
- 2025年02月宝鸡市事业单位(978人)笔试历年典型考题(历年真题考点)解题思路附带答案详解.doc
- 2024年12月中国合格评定国家认可中心第二批公开招聘笔试历年典型考题(历年真题考点)解题思路附带答案详解.doc
- 2025中国建材集团有限公司所属单位岗位合集(8月)笔试参考题库附带答案详解.doc
- 2025届浙江宁波市市域铁路投资发展有限公司校园招聘笔试参考题库附带答案详解.doc
- 2025中国通号部分二级企业副总经理岗位招聘46人笔试参考题库附带答案详解.doc
- 2025中国铝业股份有限公司招聘11人笔试参考题库附带答案详解.doc
- 2025届浪潮集团校园招聘期待你加入笔试参考题库附带答案详解.doc
文档评论(0)