- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
l龙溪中校党支部换届选举程序
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE - 16 -
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts
您可能关注的文档
- Forrster对美国零售商的调研指出.doc
- GIS在流行业的应用.doc
- googe内容网络分类介绍.doc
- GCP知学习要点.doc
- GMP认检查评定标准.doc
- GRE复详细时间表.doc
- GRC构的起源.doc
- EPOQE检索系统中WPI数据库专利编号及文献种类代码.doc
- GPRS线通信在电热网中的应用.doc
- GIA装车技术合同.doc
- XX国企党委《中国共产党国有企业基层组织工作条例(试行)》贯彻落实情况报告.docx
- 上海市水体清澈度提升技术指导意见(试行).docx
- 淄博齐鲁乙烯化工股份有限公司技术改造项目-公示版.docx
- 训战营第二期-克服团队协作的五大障碍.pptx
- 2025年6月汽车市场分析(乘用车、进口、商用车等)-2025-07-市场解读.pdf
- 任丘事业单位真题2024.docx
- 国内外BIM研究进展清华大学土木工程课件.pptx
- 企业安全生产法律法规知识培训ppt课件.pptx
- 国有企业成本管控措施-20250207065839.docx
- 2025至2030年中国空气弹簧行业市场调查分析及投资发展潜力报告.docx
最近下载
- 水泥厂电气培训课件.pptx
- 体例格式9:工学一体化课程《windows服务器基础配置与局域网组建》任务1学习任务工作页.docx VIP
- 金税四期税务风险预警指标汇总.pdf
- 豆腐柴人工栽培技术.pdf VIP
- 天津市小升初小卷真题小外(天津市外国语大学附属外国语学校)(5套含答 .pdf VIP
- 控制计划(机加).docx VIP
- 土地资源管理学(第二版)张正峰,第一至第十二章知识点.docx VIP
- 专题三 透镜及其应用 2025年中考物理基础知识考点专题练习(含答案).docx VIP
- DL/T 502-2006 火力发电厂水汽分析方法(第1-32部分).pdf VIP
- 施工现场总平面布置培训.pptx VIP
文档评论(0)