- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
NGN分话音解决方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 4
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marki
您可能关注的文档
- GRC构的起源.doc
- EPOQE检索系统中WPI数据库专利编号及文献种类代码.doc
- GPRS线通信在电热网中的应用.doc
- GIA装车技术合同.doc
- GPRS电知识总结.doc
- F发电厂动运煤车电控系统设计.doc
- G终端电邀约营销技巧.docx
- GRR原及计算.doc
- Dynaorm软件的板料冲压成形操作指引.doc
- GYC超类综合布线方案.doc
- 2025年平顶山文化艺术职业学院单招职业技能测试题库及答案参考.docx
- 2025年平顶山文化艺术职业学院单招职业技能测试题库及答案参考.docx
- 2025年职业技能培训项目数字化培训课程开发与推广路径分析.docx
- 2025年天然气勘探技术前沿动态与市场发展前景分析报告.docx
- 2025年职业技能培训项目数字化学习社区构建与实践.docx
- 2025年广东交通职业技术学院单招职业适应性考试题库及答案参考.docx
- 2025年职业技能培训项目数字化在增强现实技术中的实践报告.docx
- 2025年天然气勘探开发技术风险与机遇评估报告.docx
- 2005年上半年软件评测师上午试卷.docx
- 2025年广东交通职业技术学院单招职业适应性测试题库及参考答案.docx
最近下载
- 清水混凝土模板施工工艺.pdf VIP
- 清水混凝土施工工艺质量控制与防治演示文稿.ppt VIP
- GB50164-2021混凝土质量控制标准.docx VIP
- 文旅项目景区景点城市农文旅融合项目稻田主题策划规划方案【旅游】【文旅】【农旅】【文旅规划】.pptx VIP
- 混凝土结构工程施工质量验收规范(英文版).pptx
- 心血管科中医护理课件.pptx VIP
- 混凝土结构工程施工质量验收规范培训课件.pptx VIP
- 《混凝土结构工程施工质量验收规范》局部修订的条文及.docx VIP
- 2012混凝土结构工程施工质量验收规局部修订.doc VIP
- 《混凝土质量控制标准》XX50164-2011正文精华版.doc VIP
文档评论(0)