- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
RFID术在仓储物流中的应用研究
RFID技术在仓储物流中的应用研究
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 18
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy s
您可能关注的文档
- LED植生长灯.doc
- KV变电设计.doc
- led防马路灯和防爆灯价格.docx
- kv变电电气一次部分设计.doc
- linu命令速查手册.doc
- LGW常命令操作指导.doc
- Linu指令速查手册.docx
- LINU嵌入式操作系统知识点复习.doc
- LED灯材料产品验标准.docx
- LED射灯显示参数指导.doc
- 32页-云计算数据中心智能运维一体化.pptx
- 社会福利机构消防安全养老院.ppt
- 多元化学习平台支持下的英语劳动教育实施路径.docx
- 2023年陕西省商洛市商州区三岔河乡招聘社区工作者真题及完整答案详解1套.docx
- 2023年陕西省商洛市商州区三岔河乡招聘社区工作者真题及参考答案详解1套.docx
- 2024年高温电磁阀项目投资分析及可行性报告.docx
- 2023年陕西省商洛市商州区刘湾街道招聘社区工作者真题及答案详解一套.docx
- 书香润心灵雅言溢校园散文演讲稿(3篇).docx
- 2025至2030中国三维医学成像行业市场占有率及投资前景评估规划报告.docx
- 动力电池废弃物管理的技术与经济挑战.docx
最近下载
- 统编版六年级语文上册习作《多彩的活动》精品课件(共84张PPT).pptx VIP
- 电厂2×600MW机组扩建工程建筑及安装工程土建专业主要技术施工方案.docx VIP
- 电厂2×600MW扩建(脱硫土建、安装)工程土建专业主要施工技术方案.docx VIP
- 电厂2×600MW机组扩建工程建筑及安装锅炉专业施工技术方案.docx VIP
- 煤电公司2×600MW机组工程汽机专业主要施工技术方案.pdf VIP
- 2X660MW超超临界燃煤机组工程qtz2500型塔式起重机安装的施工方案.doc VIP
- 2X660MW超超临界燃煤机组工程#2锅炉平台楼梯安装方案全案(终版).doc VIP
- 2X660MW超超临界燃煤机组工程#2锅炉平台楼梯安装的方案.doc VIP
- 电厂(2×660MW超超临界机组)机组安装工程锅炉专业施工方案.docx VIP
- 电厂(2×660MW超超临界机组)机组安装工程汽机专业施工方案.docx VIP
文档评论(0)