- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
“献计梅旅游业发展”湾里区电子政务在线访谈
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- WXH微线路保护装置检验标准研究.docx
- windws操作系统使用详解教程.doc
- WTO的织结构.doc
- XXX地车库交通设施方案.doc
- XX公寓程营销策划方案.doc
- xMW火发电厂的电气部分设计.doc
- xu《细生物学实验》教案.doc
- XX五金料编码方案.doc
- WZJ微直流绝缘监测装置使用说明书.doc
- XX商业产项目策划方案.doc
- 2025年共享自习室会员付费模式与可持续发展研究.docx
- 人工智能在肺结节诊断中的准确性分析报告2025.docx
- 2025年社区老年大学跨境在线教育联盟在线教育平台内容生态建设与优化报告.docx
- 2025年线上职业技能竞赛平台在职业教育与未来技能需求对接中的应用.docx
- 2025年线上职业技能竞赛平台安全性与隐私保护分析报告.docx
- 新能源汽车产业链绿色金融支持体系构建与绿色制造创新报告.docx
- 共享健身仓用户健身习惯分析2025年研究报告.docx
- 全球智能手表显示面板技术突破与应用案例报告.docx
- 2025年绿色建筑材料市场双驱策略实施效果分析与建议报告.docx
- 老年大学线上课程平台用户流失预警系统设计与实施报告.docx
文档评论(0)