- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
不锈钢防插座箱和壁挂式检修电源箱价格
『润联网』
登录【润联网】查询价格
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts
您可能关注的文档
- 三大诉讼比较.doc
- 三百句心健康的名言警句.doc
- 三江源区务河流域水资源现状调查监测及其评价.doc
- 三极管基知识及测量方法.doc
- 三线五阶学模式探索.doc
- 三星手机销策略解析.doc
- 三维打印型技术最新研究进展.doc
- 三峡大学士学位点简介.doc
- 三八妇女活动文案插花活动.doc
- 上下水管装方案.doc
- 2024年双鸭山市公务员考试行测真题及1套完整答案详解.docx
- 2024年咸宁市公务员考试行测真题及答案详解参考.docx
- 2024年北京市公务员考试行测真题附答案详解(黄金题型).docx
- 2024年昌都地区公务员考试行测真题精选答案详解.docx
- 2024年周口市公务员考试行测试卷历年真题及完整答案详解一套.docx
- 2024年南宁市公务员考试行测试卷历年真题附答案详解(完整版).docx
- 2024年山东省公务员考试行测真题及答案详解(有一套).docx
- 2024年保山市公务员考试行测真题完整答案详解.docx
- 2024年彭水苗族土家族自治县公务员考试行测试卷历年真题附答案详解(考试直接用).docx
- 2024年内江市公务员考试行测真题附答案详解(模拟题).docx
文档评论(0)