- 1、本文档共41页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
专 业 码名称
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation loc
您可能关注的文档
- 三百句心健康的名言警句.doc
- 三江源区务河流域水资源现状调查监测及其评价.doc
- 三极管基知识及测量方法.doc
- 三线五阶学模式探索.doc
- 三星手机销策略解析.doc
- 三维打印型技术最新研究进展.doc
- 三峡大学士学位点简介.doc
- 三八妇女活动文案插花活动.doc
- 上下水管装方案.doc
- 三相四线能计量装置安装.doc
- 2024-2025学年教育硕士考试历年机考真题集(含答案详解).docx
- 2024-2025学年教育硕士模拟题库含答案详解【培优】.docx
- 2024-2025学年教育硕士考前冲刺练习试题附参考答案详解【完整版】.docx
- 2024-2025学年教育硕士复习提分资料附答案详解(完整版).docx
- 2024-2025学年民航职业技能鉴定模考模拟试题附完整答案详解(精选题).docx
- 2024-2025学年教育硕士测试卷【最新】附答案详解.docx
- 2024-2025学年教育硕士预测复习附答案详解(培优).docx
- 2024-2025学年教育硕士考试彩蛋押题含答案详解【实用】.docx
- 2024-2025学年民航职业技能鉴定复习提分资料(突破训练)附答案详解.docx
- 2024-2025学年民航职业技能鉴定全真模拟模拟题及完整答案详解【精选题】.docx
最近下载
- 水泵进出口管径计算及核对计算表.xls VIP
- 2025年淮安出租车从业资格证模拟考试试题.docx VIP
- DBJ50T-376-2020 老旧小区改造提升建设标准 .docx VIP
- “校园服务” 校园生活服务商业计划书.docx
- 35kV箱式变电站(华变)2500KVA技术规范书.doc VIP
- 欧陆SSD690+软件手册.pdf
- 电子工程通信技术 - 4G终端测试规范——3GPPTS36.521测试项解析.pdf VIP
- 病案管理质量控制指标.pptx VIP
- 沙漠治理的施工组织设计.doc VIP
- IEC 61000-3-2-2024(E) Electromagnetic compatibility (EMC) – Part 3-2:Limits – Limits for harmonic current emissions (equipment input current 16 A per phase) 电磁兼容性(EMC) . 第3-2部分: 极限. 谐波电流发射的极限(设备输入电流每相16A).pdf
文档评论(0)