- 1、本文档共26页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国公民伊朗旅游须知
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 两会主要容.doc
- 两会期间传服务方案.doc
- 东阿阿胶花姬营销策划案.doc
- 东莞常平岛酒店无线网络成功案例.docx
- 东风风神销策划分析.doc
- 东财《公社交礼仪》在线作业一.doc
- 丧葬服务未来经营模式探讨.doc
- 东南大学电实验第八次实验有源滤波器.doc
- 两种绩效数计算方法的比.docx
- 个人委托档人员参加基本医疗保险须知.doc
- 从银行承销视角看城投债发行有哪些变化.pdf
- 德福科技锂电PCB铜箔双龙头,高端化勇攀高峰.pdf
- 电力设备行业新型电力系统报告之四:电网发展回顾及后续展望,特高压稳步推进隐忧仍在,配网低于预期改革初见端倪.pdf
- 电力设备与新能源行业AIDC系列深度:海外大厂引领高压直流革命,800V产业化进程有望加速.pdf
- 电力行业5月月报:风光装机抢装进入高潮,火电电量增速由负转正.pdf
- 电子行业动态:Oracle签300亿美元大单,英伟达算力需求旺盛.pdf
- 豆神教育教育转型焕锋芒,AI教育拓疆界.pdf
- 多元金融行业寰宇通汇系列五:互联网券商Robinhood,一揽子交易提供商.pdf
- 非银金融行业深度研究报告:稳定币系列报告之一,从铸币到流通,稳定币生态拆解.pdf
- 分众传媒公司深度研究:收购扩渠道,携手支付宝打通转化链路,看好后续增长.pdf
文档评论(0)