- 1、本文档共26页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中成药的,到底有多深
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 中国旅行的发展.doc
- 中国汽车费主要种类及征收阶段划分.doc
- 中国法律想史网上作业.doc
- 中国文化业国际竞争力评价及策略研究.doc
- 中国海上险法律的修改.doc
- 中国水电发现状.doc
- 中国消费购买行为模式分析及营销对策.doc
- 中国法律想史串讲.doc
- 中国水资状况.doc
- 中国沭阳化产业园.doc
- 小学生音乐社团活动在提高学生音乐素养中的关键作用教学研究课题报告.docx
- 水墨游戏美术说课课件.pptx
- 2025至2030电子机械行业市场深度调研及发展趋势与行业项目调研及市场前景预测评估报告.docx
- 2025民航职业技能鉴定常考点试卷附参考答案详解(培优B卷).docx
- 2025-2030中国可再生能源技术突破及市场前景预判报告.docx
- 2025至2030电子材料行业市场占有率及投资前景评估规划报告.docx
- 2025至2030合成树脂涂料行业发展趋势分析与未来投资战略咨询研究报告.docx
- 2025年医疗健康APP市场细分领域发展趋势研究报告.docx
- 2025年医疗健康APP服务质量评价与用户忠诚度研究.docx
- 2025至2030手机配件行业市场深度调研及供需格局及有效策略与实施路径评估报告.docx
文档评论(0)