- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
基于suermap 的城市中小零售商选址系统设计与实现
南京晓庄晓庄学院2012届本科毕业设计
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mar
您可能关注的文档
最近下载
- 甘肃省暴雨图集新版.pdf VIP
- 课题开题报告:学科素养导向的道德与法治“教-学-评”一体设计研究.docx VIP
- 马工程《民法学》(第二版)下册参考教学课件07-11民法学-第七编 侵权责任法 第十一章.pptx VIP
- 小学英语核心素养培养与跨学科融合教学策略研究教学研究课题报告.docx
- TZS 0678—2025《生物安全实验室工作人员本底血清样本管理规范》(水印版).pdf VIP
- 河南省信阳市2025年某中学小升初入学分班考试语文考试真题含答案.docx VIP
- 马工程《民法学》(第二版)下册参考教学课件07-10民法学-第七编 侵权责任法 第十章.pptx VIP
- (高清版)DB13(J)∕T 8453-2021 住宅工程常见质量问题控制标准.pdf VIP
- 2024年水浒传知识点及考点总结.docx VIP
- 大学校园内急救知识培训.pptx VIP
原创力文档


文档评论(0)