- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
急诊常用剂说明书
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 建筑给排设计中的节水措施.doc
- 建筑给水水及消防监理实施细则.doc
- 建筑立面饰设计技术导则.doc
- 建筑节能意义与主要途径.doc
- 建筑资料全!!!.doc
- 建筑给排消防系统设计要点总结.docx
- 建筑给水聚氯乙烯管道设计.doc
- 建筑行业项目上 一开始做什么最好.doc
- 建筑电气才培养模式.doc
- 建设学习党组织心得体会.doc
- cpa注册会计师职业能力综合测试真题试卷+答案.docx
- 有趣的汉字初一作文500字[12篇].docx
- 2025年元宇宙社交平台虚拟社交互动体验分析与改进报告.docx
- 《古埃及文明探秘:世界历史教学教案》.doc
- 网络文学出海合作伙伴选择报告:2025年跨文化传播策略分析.docx
- 新能源商用车辆市场前景展望:2025年需求与应用场景报告.docx
- cpa注册会计师职业能力综合测试真题试卷+解析及答案.docx
- 2025年农业物联网在农业生产技术集成中的应用效果与策略.docx
- 金融科技在普惠金融中的应用效果评估:2025年政策环境与市场响应.docx
- 扬起和谐的风帆驶向和谐的彼岸600字通用15篇.docx
文档评论(0)