- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
浅谈肿瘤学的现状一篇读书心得
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 浅析祝福信的语言特点.doc
- 浅析秘书礼仪修养.doc
- 浅析电子务环境下第三方物流的发展对策.doc
- 浅析舞弊计侦查与策略.doc
- 浅析网络销论文.doc
- 浅析苏宁展现状及营销策略.doc
- 浅析港口流发展与对策.doc
- 浅析责任险在化解民生矛盾中的作用.doc
- 浅析太阳发电的应用和前景.doc
- 浅析测量房屋建筑中的应用.doc
- 给荔红简约中国风员工述职报告.pptx
- 2023门窗行业招商加盟数据分析报告.pdf
- 《基于基因表达数据的胰腺癌预后研究现状综述》3900字.docx
- 《连云港美致医疗器械公司员工激励问题及对策分析》9300字.docx
- 《惠州名道时尚武夷岩茶股份有限公司企业文化建设研究》9000字.docx
- 2024年02月中国共产党崇左市委员会党史研究室(广西)2024年招考1名编外工作人员笔试参考题库后附答案详解.docx
- 2024年02月中共清远市委办公室(广东)2024年公开选调2名公务员笔试参考题库后附答案详解.docx
- 2024年02月中共雅安市雨城区委组织部2024年公开考核招考4名高层次人才笔试参考题库后附答案详解.docx
- 2024年02月中国基本建设优化研究会2024年招考笔试参考题库后附答案详解.docx
- 2024年02月中国伊斯兰教协会2024年度面向社会公开招考2名工作人员笔试参考题库后附答案详解.docx
文档评论(0)