- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
生态影响项评价及生态修复方案分析
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 16
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 环保 气 人类活动.docx
- 现代农业技术答案.doc
- 现代商贸流园区信息平台建设的研究.doc
- 现代媒介论教学大纲.doc
- 现代教育术作业三四.doc
- 现代文理院各专业教学大纲模式.doc
- 王成的论《北京现代S店营销现状分析及策略研究》.doc
- 现代教育术基本概念与术语全.doc
- 现代汽车纳营销策略分析.doc
- 现代物流区建设.doc
- 2024通信工程师考试考试黑钻押题含答案详解【预热题】.docx
- 2024通信工程师考试考试黑钻押题带答案详解(典型题).docx
- 2024通信工程师考试考试黑钻押题含答案详解(考试直接用).docx
- 2024通信工程师考试考试黑钻押题含答案详解(模拟题).docx
- 2025年生物基材料研发资助申请报告.docx
- 2024通信工程师考试考试黑钻押题含答案详解【精练】.docx
- 2025年四川雅安市招聘学校教师115人笔试模拟试题含答案详解.docx
- 重心题目及答案.doc
- 2024通信工程师考试能力提升B卷题库及参考答案详解【模拟题】.docx
- 2024通信工程师考试能力提升B卷题库及参考答案详解一套.docx
文档评论(0)