- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
电子商业票知识
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 甲状腺癌治指南.doc
- 甲状腺肿诊治指南.doc
- 甲醇装置结构安装方案.doc
- 甲醇精馏设计.doc
- 申报国家然科学基金项目申请书样板.doc
- 申报水利统先进单位材料.doc
- 申克电子带秤中文说明书.doc
- 用阳光心谱写女性风采.doc
- 由我国投产出表得到的产业结构及产业关联分析.doc
- 申请书填要求及示范文本.doc
- 2025个人洗护市场趋势洞察报告.pptx
- 中东天然气设备深度报告:发电+能源转型加速中东天然气开发,中东装备出海正当时.pptx
- 2025个人洗护市场趋势洞察报告.pdf
- 非银金融行业深度报告:财富管理系列报告之二——公募基金改革方案出台,推动行业高质量发展.docx
- 2025年H1微短剧行业观察与营销指南报告.pptx
- 2025年负荷中心储能潜力及发展机制研究报告-南部区域.docx
- 2025年二季度投融市场报告:智能硬件.docx
- 火炮深度:战争之神,王者归来.docx
- 2025年机遇之风:海上风电赋能澳大利亚清洁能源未来报告(英文版).pdf
- 2025年外包行业的未来:重新审视一切研究报告(英文版).docx
文档评论(0)